NUCLEAR POWER UKRAINE

NUCLEAR POWER UKRAINE
NUCLEAR POWER UKRAINE

Nuclear power in Ukraine

This article may be affected by the following current event2022 Russian invasion of Ukraine. Information in this article may change rapidly as the event progresses. Initial news reports may be unreliable. The last updates to this article may not reflect the most current information. Please feel free to improve this article (but note that updates without valid and reliable references will be removed) or discuss changes on the talk page(March 2022) (Learn how and when to remove this template message)

Ukraine operates four nuclear power plants with 15 reactors located in Volhynia and South Ukraine. The total installed nuclear power capacity is over 13 GWe, ranking 7th in the world in 2020. Energoatom, a Ukrainian state enterprise, operates all four active nuclear power stations in Ukraine. In 2019, nuclear power supplied over 20% of Ukraine’s energy. Rivne Nuclear Power Plant

70TWh of electricity generation was nuclear in 2020, which was over 50%.[4] This was the 3rd largest share, only France and Slovakia had a higher share. The largest nuclear power plant in Europe is in Ukraine.

The 1986 Chernobyl disaster in Northern Ukraine was the world’s most severe nuclear accident.

Lack of coal for Ukraine’s coal-fired power stations due to the War in Donbass and a shut down one of the six reactors of the Zaporizhzhia Nuclear Power Plant lead to rolling blackouts throughout the country in December 2014.[5][6][7][8][9]

Contents

Overview

Electricity production by source, UkraineZaporizhzhia Nuclear Power Plant is Europe’s largest with six reactors whose total capacity is 6 GW[1]Khmelnytskyi NPPRivne NPPUkrainian coin commemorating nuclear power

Ukraine relies to a large extent on nuclear power.

The largest nuclear power plant in Europe, the Zaporizhzhia Nuclear Power Plant, is located in Ukraine. In 2006, the government planned to build 11 new reactors by the year 2030, which would almost double the current amount of nuclear power capacity.[10] Ukraine’s power sector is the twelfth-largest in the world in terms of installed capacity, with 54 gigawatts (GW).[11] Renewable energy still plays a very modest role in electrical output; in 2005 energy production was met by the following sources: nuclear (47 percent), thermal (45 percent), hydroelectric and other (8 percent).[10]Chernobyl AES

The Chernobyl disaster was a nuclear accident that occurred on 26 April 1986 at the Chernobyl Nuclear Power Plant in Ukraine. An explosion and fire released large quantities of radioactive contamination into the atmosphere, which spread over much of Western USSR and Europe. It is considered the worst nuclear power plant accident in history, and is one of only two classified as a level 7 event on the International Nuclear Event Scale (the other being the Fukushima Daiichi nuclear disaster).[12] The battle to contain the contamination and avert a greater catastrophe ultimately involved over 500,000 workers and cost an estimated 18 billion rubles, crippling the Soviet economy.[13]

Ukraine used to receive its nuclear fuel exclusively from Russia by the Russian company TVEL. Since 2008 the country also gets nuclear fuel from Westinghouse.[14] Since 2014 Westinghouse’s share of imports grew to more than 30% in 2016 due to strong social disapproval of any economic relations with Russia after Crimea annexation.[1] In 2018 Westinghouse’s contract to supply VVER fuel was extended to 2025.[15] Oil and natural gas provide the remainder of the country’s energy; these are also imported from the former Soviet Union.

In 2011 Energoatom began a project to bring safety into line with international standards at an estimated cost of $1.8 billion, with a target completion date of 2017. In 2015 the completion date was put back to 2020, due to financing delays.[16] In 2015 some government agencies made corruption allegations against Energoatom, with concerns raised by Prime Minister Arseniy Yatsenyuk.[17] In March 2016, Energoatom’s assets and bank accounts were frozen by Ukrainian courts over allegedly unpaid debts; Energoatom appealed the decision, but the frozen finances led to contractual breaches.[18] In June 2016 its bank accounts were unfrozen.[19]

In February 2018 Ukraine secured $250 million of U.S. funding to build a spent nuclear fuel storage facility, which will avoid the need to ship spent nuclear fuel to Russia.[20]

In 2018 Energoatom stated that electricity prices were too low to cover the cost of new nuclear fuel, and called for a price increase.[21]

In 2008 Westinghouse Electric Company won a five-year contract selling nuclear fuel to three Ukrainian reactors starting in 2011.[22] Following Euromaidan then President Viktor Yanukovych introduced a ban on Rosatom nuclear fuel shipments to Europe via Ukraine, which was in effect from 28 January until 6 March 2014.[23] By 2016, Russia’s share was down to 55 percent, Westinghouse supplying nuclear fuel for six of Ukraine’s VVER-1000 nuclear reactors.[24] After the Russian annexation of Crimea in April 2014, the National Nuclear Energy Generating Company of Ukraine Energoatom and Westinghouse extended the contract for fuel deliveries through 2020.[25]

In 2019 Energoatom and Turboatom signed a five year contract to modernise condensers and turbines at a number of Ukrainian nuclear power plants.[26]

On 4 December 2019, Ukraine’s government appointed Pavlo Pavlyshyn as acting head of Energoatom. During January 2020 Energoatom discussed eight legislative bills with the chairman of the Ukrainian parliament subcommittee on nuclear energy and safety, aimed at meeting international obligations and standards, and the financial stabilisation of Energoatom.[27]

In August 2021 Energoatom and Westinghouse signed a contract for construction of Westinghouse AP1000 reactors to replace the unfinished blocks in Khmelnitskyi power plant.[28]

In March 2022, Russian forces siezed control of the Zuprive power plant. It is still safe however. [29]

Uranium mining

In 2005 there were 17 deposits on the state balance account.[30] Three of them Vatutine, Central, and Michurinske were being developed, while an ore enrichment[clarification needed] factory was being built at Novokostiantyniv.[30] Number of deposits are exhausted (i.e. Devladove, Zhovtorichenske, Pershotravneve, Bratske).[31][30]

Activists have been long alerting about Dnipro Chemical Plant in Kamianske, which is a Soviet-times military uranium processing facility that consists of industrial buildings, equipment containing uranium waste as well as large landfills where tailings were stored. Small scale soil, water and dust leaks have been documented from the facility, but apart from securing the perimeter not much has been done to properly secure the plant.[32]

List of reactors

Main article: List of nuclear reactors § UkraineSee also: List of power stations in Ukraine

All of Ukraine’s RBMK reactors (the type involved in the 1986 Chernobyl disaster) were located at the Chernobyl Nuclear Power Plant. All of the reactors there have been shut down, leaving only the much safer VVER reactors operating in the country.[1] Three of the reactors listed were built in post-independence Ukraine, with the first one of these being constructed in 1995; the other sixteen reactors the country inherited from the Soviet Union.

Chernobyl

Chernobyl

Chyhyryn

Chyhyryn

Crimea

Crimea

Kharkiv

Kharkiv

Khmelnytskyi

Khmelnytskyi

Odesa

Odesa

Rivne

Rivne

South Ukraine

South Ukraine

Zaporizhzhia

Zaporizhzhiaclass=notpageimage|Nuclear power plants in Ukraine (view)
 Active plants
Closed plants
Unfinished plants

Active plants with power generating capabilities

NameLocationTypeCapacity, MWeOperationalNotes
KhmelnytskyiNetishynVVER10001987-
VVER10002004-
VVER1000constructionstarted in 1986, to be finished as VVER in 2026
VVER1100constructionstarted in 1987, to be demolished and replaced by AP1000
AP10001100plannedunit 5; planned as AP1000
RivneVarashVVER4401980-
VVER4401981-
VVER10001986-
VVER10002004-
South UkraineYuzhnoukrainskVVER10001982-
VVER10001985-
VVER10001989-
VVER1000constructionstarted in 1987 is frozen
ZaporizhzhiaEnerhodarVVER10001984-largest nuclear power plant in Europe
VVER10001985-
VVER10001986-
VVER10001987-
VVER10001989-
VVER10001995-
TotalUkraineVVER138191981 (1978)-

Research reactors[edit]

NameLocationTypeCapacity, MWeOperationalNotes
Sevastopol UniversitySevastopolIR-100 [uk]1001967-ceased by the Russian Federation
Institute for Nuclear Research NASUKyivVVR-M [uk]101960-
Kharkiv Institute of Physics and TechnologyKharkivThe source of neutrons2016-

Unfinished and closed plants

Chyhyryn NPP (draft)

NameLocationTypeCapacity, MWeOperationalNotes
Chernobyl NPPPripyatRBMK10001977-1996
RBMK10001978-1991stopped after the 1991 accident
RBMK10001981-2000
RBMK10001984-1986exploded in the Chernobyl accident
RBMK1000constructionstarted in 1981, it was frozen 1987
RBMK1000constructionstarted in 1981, it was frozen 1987
Crimean NPPShcholkineVVER950constructionstarted in 1982, it was frozen 1989
VVER950constructionstarted in 1983, it was frozen 1989
VVER950plans
VVER950plans
Odesa NTECTeplodarVVER940preparationsceased in 1989
VVER940preparationsceased in 1989
Kharkiv NTECBirkyVVER940preparationsstarted in 1986, it was frozen 1989
VVER940preparationsstarted in 1986, it was frozen 1989
VVER940plans
VVER940plans
Chyhyryn NPPOrbitaVVER1000plansscratched in 1989
VVER1000plansscratched in 1989
VVER1000plansscratched in 1989
VVER1000plansscratched in 1989

Anti-nuclear picket in Kyiv

See also